LNG
Hagar LNG Plant Upgrade Assessments
Canada’s oldest LNG plant
Jenmar Role
Various engineering assessments including:
Overall plant assessment with recommendations for upgrade priority.
Boil-off gas analysis and recommendations for methods to reduce boil-off gas.
Preliminary design study to develop methods of reducing icing issues on an LNG tank PRV vent system. Included CFD analysis of ice build-up mechanism and modification design and modification procedure development.
Plant assessment based on evaluation of: (1) Boil-off-gas; (2) Liquefaction (3) Product send-out; and, (4) common systems;
On site visual inspection of plant equipment by Jenmar Engineers;
Review of production data, plant logs, drawings and reports; Interviews with plant staff;
External visual condition assessment for LNG Storage, Air Liquide Cold Box (from the late 1960’s), LNG pumps and compressors/engines, mixed refrigerants, vaporizers, instrumentation. Assessment of foundation and corrosion. Corrective actions identified with recommendations presented in terms of concern and priority;
Development of cold box leak assessment procedures for helium and sonic probe tests;
Coordination of leak testing with third parties and Union Gas staff;
Assessment model of plant availability for different operating conditions.
Union Gas / Enbridge
Location: Hagar, ON
Status: Completed 2017-2021