LNG

Tilbury LNG Off-Loading Pump Installation Upgrade

Installation of a new LNG pump and LNG plant tie-in.

Jenmar Role

  • LNG pump selection and vendor management

  • Process design

  • Mechanical piping system design and Caesar II pipe stress analysis

  • Structural design of pump platform and tie-in to plant

  • Instrumentation and controls tie-in to plant

Fortis BC
Location: Delta, BC
Status: Completed 2015-2016

Previous
Previous

Whistler Temporary LNG Storage and Regasification System

Next
Next

Fording River LNG Fueling Station & Maintenance Facility Upgrades